Rocksolid Light

News from da outaworlds

mail  files  register  groups  login

Message-ID:  

Don't you wish you had more energy... or less ambition?


comp / comp.os.linux.advocacy / Buttigieg: Building 8 EV Charging Stations Under $7.5 Billion Investment for Them Is 'On Track'

SubjectAuthor
* Buttigieg: Building 8 EV Charging Stations Under $7.5 Billion Investment for TheJohn Smyth
+* Re: Buttigieg: Building 8 EV Charging Stations Under $7.5 Billion Investment forRyan Jones
|`- Re: Buttigieg: Building 8 EV Charging Stations Under $7.5 Billion Investment forpothead
+* Re: Buttigieg: Building 8 EV Charging Stations Under $7.5 Billion Investment forletards
|`- Re: Buttigieg: Building 8 EV Charging Stations Under $7.5 Billion Investment forGovernor Swill
`- Re: Buttigieg: Building 8 EV Charging Stations Under $7.5 Billion Investment forD. Ray

1
Subject: Buttigieg: Building 8 EV Charging Stations Under $7.5 Billion Investment for Them Is 'On Track'
From: John Smyth
Newsgroups: alt.fan.rush-limbaugh, alt.politics.republicans, talk.politics.guns, comp.os.linux.advocacy, alt.computer.workshop
Organization: A noiseless patient Spider
Date: Fri, 20 Sep 2024 15:37 UTC
Path: eternal-september.org!news.eternal-september.org!.POSTED!not-for-mail
From: smythlejon2@hotmail.com (John Smyth)
Newsgroups: alt.fan.rush-limbaugh,alt.politics.republicans,talk.politics.guns,comp.os.linux.advocacy,alt.computer.workshop
Subject: Buttigieg: Building 8 EV Charging Stations Under $7.5 Billion Investment for Them Is 'On Track'
Date: Fri, 20 Sep 2024 11:37:56 -0400
Organization: A noiseless patient Spider
Lines: 46
Message-ID: <3j5rej5i7cco7frvenbum7g2b06ln49u8q@4ax.com>
MIME-Version: 1.0
Content-Type: text/plain; charset=ISO-8859-1
Content-Transfer-Encoding: 8bit
Injection-Date: Fri, 20 Sep 2024 17:37:58 +0200 (CEST)
Injection-Info: dont-email.me; posting-host="6be212f98e3709f26ff8474f393f20e8";
logging-data="1233189"; mail-complaints-to="abuse@eternal-september.org"; posting-account="U2FsdGVkX1/JO08CbgCZpfZoXrQOV8DsCSU6wkv56N4="
User-Agent: ForteAgent/8.00.32.1272
Cancel-Lock: sha1:hCUlZQ3EIZbKilSpMqyc47LGxCg=
View all headers

On track for what?
China can build a coal plant in a week and we can't even build a
charging station.

Buttigieg: Building 8 EV Charging Stations Under $7.5 Billion Investment
for Them Is ‘On Track’

<https://www.breitbart.com/clips/2024/09/20/buttigieg-building-8-ev-charging-stations-under-7-5-billion-investment-for-them-is-on-track/>

'On Thursday’s broadcast of CNBC’s “Squawk Box,” Transportation
Secretary Pete Buttigieg stated that building eight electric vehicle
charging stations so far under the Inflation Reduction Act’s $7.5
billion investment in electric vehicle charging stations is “on track.”
Because most construction will occur in the second half of the decade.

Co-host Joe Kernen asked, “[O]ur designs on electrification of the auto
industry, have we recalibrated there? And I’ll just give you one item
and you can — maybe you can explain why, but under the Inflation
Reduction Act, 7.5 billion for building these charging stations. The
latest information, eight have been built with the 7.5 billion that had
been allocated. You’re supposed to get to 500,000 of these charging
stations by 2030. What is really the problem with — do you — have you
looked at that and figured out why?”

Buttigieg responded, “Oh yeah, that’s on track. So, we’re at about
190,000 publicly available charging stations in the U.S. That’s
approximately double what the level was when President Biden came in.
The issue, though, is that there are some gaps in the market, ones that
are just not going to be built by the private sector that’s been
building the construction of those chargers to date. That’s why the
legislation provided for funding to do federally-supported chargers that
are intended to be online before 2030. Now, the bulk of that
construction will happen in ’27, ’28, quite a bit, actually, I expect by
2026. A handful, as you mentioned, are actually already up and running.
But really what you’re going to see is more in the second half of this
decade. And it’s really important to have those federally-supported
chargers, because you have stretches of road or even just in the middle
of our cities, apartment buildings, places in our economy where it just
doesn’t yet pencil out for there to be the private sector profitably
doing that. And even though about 80% of EV charging happens at home,
the reality is that the new EV kind of landscape we’re working toward
where the president’s goal is about half of sales to be EVs by the end
of this decade requires us, by the end of this decade, to have a lot of
charging apparatus that just isn’t there as we’re sitting here in
2024.”'

Subject: Re: Buttigieg: Building 8 EV Charging Stations Under $7.5 Billion Investment for Them Is 'On Track'
From: Ryan Jones
Newsgroups: alt.fan.rush-limbaugh, alt.politics.republicans, talk.politics.guns, comp.os.linux.advocacy, alt.engineering.electrical
Organization: Mixmin
Date: Fri, 20 Sep 2024 19:37 UTC
References: 1
Path: eternal-september.org!news.eternal-september.org!feeder3.eternal-september.org!news.mixmin.net!.POSTED!not-for-mail
From: rjones@paramount.com (Ryan Jones)
Newsgroups: alt.fan.rush-limbaugh,alt.politics.republicans,talk.politics.guns,comp.os.linux.advocacy,alt.engineering.electrical
Subject: Re: Buttigieg: Building 8 EV Charging Stations Under $7.5 Billion
Investment for Them Is 'On Track'
Date: Fri, 20 Sep 2024 12:37:48 -0700
Organization: Mixmin
Message-ID: <vckiub$3a3f2$5@news.mixmin.net>
References: <3j5rej5i7cco7frvenbum7g2b06ln49u8q@4ax.com>
MIME-Version: 1.0
Content-Type: text/plain; charset=UTF-8; format=flowed
Content-Transfer-Encoding: 8bit
Injection-Date: Fri, 20 Sep 2024 19:37:48 -0000 (UTC)
Injection-Info: news.mixmin.net; posting-host="c4af4a3027e8317d29ea238d8aa6bb2f616aa3fc";
logging-data="3476962"; mail-complaints-to="abuse@mixmin.net"
User-Agent: Mozilla Thunderbird
Content-Language: en-US
In-Reply-To: <3j5rej5i7cco7frvenbum7g2b06ln49u8q@4ax.com>
View all headers

On 9/20/2024 8:37 AM, John Smyth wrote:
> On track for what?
> China can build a coal plant in a week and we can't even build a
> charging station.
>
> Buttigieg: Building 8 EV Charging Stations Under $7.5 Billion Investment
> for Them Is ‘On Track’
>
>
> <https://www.breitbart.com/clips/2024/09/20/buttigieg-building-8-ev-charging-stations-under-7-5-billion-investment-for-them-is-on-track/>
>
> 'On Thursday’s broadcast of CNBC’s “Squawk Box,” Transportation
> Secretary Pete Buttigieg stated that building eight electric vehicle
> charging stations so far under the Inflation Reduction Act’s $7.5
> billion investment in electric vehicle charging stations is “on track.”
> Because most construction will occur in the second half of the decade.
>
> Co-host Joe Kernen asked, “[O]ur designs on electrification of the auto
> industry, have we recalibrated there? And I’ll just give you one item
> and you can — maybe you can explain why, but under the Inflation
> Reduction Act, 7.5 billion for building these charging stations. The
> latest information, eight have been built with the 7.5 billion that had
> been allocated. You’re supposed to get to 500,000 of these charging
> stations by 2030. What is really the problem with — do you — have you
> looked at that and figured out why?”
>
> Buttigieg responded, “Oh yeah, that’s on track. So, we’re at about
> 190,000 publicly available charging stations in the U.S. That’s
> approximately double what the level was when President Biden came in.
> The issue, though, is that there are some gaps in the market, ones that
> are just not going to be built by the private sector that’s been
> building the construction of those chargers to date. That’s why the
> legislation provided for funding to do federally-supported chargers that
> are intended to be online before 2030. Now, the bulk of that
> construction will happen in ’27, ’28, quite a bit, actually, I expect by
> 2026. A handful, as you mentioned, are actually already up and running.
> But really what you’re going to see is more in the second half of this
> decade. And it’s really important to have those federally-supported
> chargers, because you have stretches of road or even just in the middle
> of our cities, apartment buildings, places in our economy where it just
> doesn’t yet pencil out for there to be the private sector profitably
> doing that. And even though about 80% of EV charging happens at home,
> the reality is that the new EV kind of landscape we’re working toward
> where the president’s goal is about half of sales to be EVs by the end
> of this decade requires us, by the end of this decade, to have a lot of
> charging apparatus that just isn’t there as we’re sitting here in
> 2024.”'

Buttfag is just as dumb as any other Biden (Obama) DEI hire. That
stupid fool has been caught numerous times embellishing his wikipedia
page and lying about it.

The BEVs won't be there either. Market for them is going to shit
because they are worthless in remote areas and require too much time to
recharge.

Wait until the Democrats little black pets decide BEV owners are easy
prey and target the charging stations.

Subject: Re: Buttigieg: Building 8 EV Charging Stations Under $7.5 Billion Investment for Them Is 'On Track'
From: pothead
Newsgroups: alt.fan.rush-limbaugh, alt.politics.republicans, talk.politics.guns, comp.os.linux.advocacy, alt.engineering.electrical
Organization: Kamala Harris Sucks
Date: Fri, 20 Sep 2024 19:51 UTC
References: 1 2
Path: eternal-september.org!news.eternal-september.org!.POSTED!not-for-mail
From: pothead@snakebite.com (pothead)
Newsgroups: alt.fan.rush-limbaugh,alt.politics.republicans,talk.politics.guns,comp.os.linux.advocacy,alt.engineering.electrical
Subject: Re: Buttigieg: Building 8 EV Charging Stations Under $7.5 Billion
Investment for Them Is 'On Track'
Date: Fri, 20 Sep 2024 19:51:44 -0000 (UTC)
Organization: Kamala Harris Sucks
Lines: 71
Message-ID: <vckjog$17r5b$1@dont-email.me>
References: <3j5rej5i7cco7frvenbum7g2b06ln49u8q@4ax.com>
<vckiub$3a3f2$5@news.mixmin.net>
MIME-Version: 1.0
Content-Type: text/plain; charset=UTF-8
Content-Transfer-Encoding: 8bit
Injection-Date: Fri, 20 Sep 2024 21:51:44 +0200 (CEST)
Injection-Info: dont-email.me; posting-host="6be212f98e3709f26ff8474f393f20e8";
logging-data="1305771"; mail-complaints-to="abuse@eternal-september.org"; posting-account="U2FsdGVkX1/83etxpjnrVn2Af1GOLL1I"
User-Agent: slrn/1.0.3 (Linux)
Cancel-Lock: sha1:UHLyPso+EIx2DpTnm7RJxl7PhIA=
View all headers

On 2024-09-20, Ryan Jones <rjones@paramount.com> wrote:
> On 9/20/2024 8:37 AM, John Smyth wrote:
>> On track for what?
>> China can build a coal plant in a week and we can't even build a
>> charging station.
>>
>> Buttigieg: Building 8 EV Charging Stations Under $7.5 Billion Investment
>> for Them Is ‘On Track’
>>
>>
>> <https://www.breitbart.com/clips/2024/09/20/buttigieg-building-8-ev-charging-stations-under-7-5-billion-investment-for-them-is-on-track/>
>>
>> 'On Thursday’s broadcast of CNBC’s “Squawk Box,” Transportation
>> Secretary Pete Buttigieg stated that building eight electric vehicle
>> charging stations so far under the Inflation Reduction Act’s $7.5
>> billion investment in electric vehicle charging stations is “on track.”
>> Because most construction will occur in the second half of the decade.
>>
>> Co-host Joe Kernen asked, “[O]ur designs on electrification of the auto
>> industry, have we recalibrated there? And I’ll just give you one item
>> and you can — maybe you can explain why, but under the Inflation
>> Reduction Act, 7.5 billion for building these charging stations. The
>> latest information, eight have been built with the 7.5 billion that had
>> been allocated. You’re supposed to get to 500,000 of these charging
>> stations by 2030. What is really the problem with — do you — have you
>> looked at that and figured out why?”
>>
>> Buttigieg responded, “Oh yeah, that’s on track. So, we’re at about
>> 190,000 publicly available charging stations in the U.S. That’s
>> approximately double what the level was when President Biden came in.
>> The issue, though, is that there are some gaps in the market, ones that
>> are just not going to be built by the private sector that’s been
>> building the construction of those chargers to date. That’s why the
>> legislation provided for funding to do federally-supported chargers that
>> are intended to be online before 2030. Now, the bulk of that
>> construction will happen in ’27, ’28, quite a bit, actually, I expect by
>> 2026. A handful, as you mentioned, are actually already up and running.
>> But really what you’re going to see is more in the second half of this
>> decade. And it’s really important to have those federally-supported
>> chargers, because you have stretches of road or even just in the middle
>> of our cities, apartment buildings, places in our economy where it just
>> doesn’t yet pencil out for there to be the private sector profitably
>> doing that. And even though about 80% of EV charging happens at home,
>> the reality is that the new EV kind of landscape we’re working toward
>> where the president’s goal is about half of sales to be EVs by the end
>> of this decade requires us, by the end of this decade, to have a lot of
>> charging apparatus that just isn’t there as we’re sitting here in
>> 2024.”'
>
> Buttfag is just as dumb as any other Biden (Obama) DEI hire. That
> stupid fool has been caught numerous times embellishing his wikipedia
> page and lying about it.
>
> The BEVs won't be there either. Market for them is going to shit
> because they are worthless in remote areas and require too much time to
> recharge.
>
> Wait until the Democrats little black pets decide BEV owners are easy
> prey and target the charging stations.
>
Yea.
For a guy with impressive education credentials he sure doesn't seem to be able to
perform the job he was appointed to.

--
pothead
Kamala Harris Word Salad Special Of The Day
Served Complete With Venn Diagram Dressing

Subject: Re: Buttigieg: Building 8 EV Charging Stations Under $7.5 Billion Investment for Them Is 'On Track'
From: letards
Newsgroups: alt.fan.rush-limbaugh, alt.politics.republicans, talk.politics.guns, comp.os.linux.advocacy, alt.computer.workshop
Date: Sat, 21 Sep 2024 03:52 UTC
References: 1
Sender: Fritz Wuehler <fritz@spamexpire-202409.rodent.frell.theremailer.net>
Path: eternal-september.org!news.eternal-september.org!feeder3.eternal-september.org!news.mixmin.net!news.neodome.net!mail2news
Subject: Re: Buttigieg: Building 8 EV Charging Stations Under $7.5 Billion Investment for Them Is 'On Track'
Comments: This message did not originate from the Sender address above.
It was remailed automatically by anonymizing remailer software.
Please report problems or inappropriate use to the
remailer administrator at <abuse@frell.theremailer.net>.
Identifying the real sender is technically impossible.
Comments: This message was transferred to Usenet via mail2news gateway at
<mail2news@neodome.net>. Please send questions and concerns to
<admin@neodome.net>. Report inappropriate use to <abuse@neodome.net>.
Newsgroups: alt.fan.rush-limbaugh,alt.politics.republicans,talk.politics.guns,comp.os.linux.advocacy,alt.computer.workshop
Injection-Info: neodome.net;
posting-account="mail2news";
key="XUn6UThBA85qkEGMN1hg5TBAZR9f6I0PAd8S3G70N52PL5Wkl2Ct8KdZNsKPZlRbmgozab
X6SvmqJZnjb3hm4omUvI7KVLEPvXkCug9D1Se6afJWn5saTAvuD1A72/LMVOJFpbVIjS0jUtpZd
5J8FQcj+v86mJWC2oEFCAs8KMeOk0oGVSceVkYJEKFQXnqQPgRYAwnqI7mov4A4NuNGDrAZBBHm
iFMVapdUKUJd87hARGJJkQ3OkTxlmxCwjUWcdxExN5q/PUOHHflkm7a0C+2kA2L5muwTuAZywxJ
ByyNRbQ49xfHTcxXQQgrQtgXfzWa118w96aSkJx8dc/neXg==";
data="U2FsdGVkX19YAW5g6LHOkbEqbH+MEKCv+0KibOxjRbPuQGNiPAB89+kSrvyuRvOK8gNCq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==
";
mail-complaints-to="abuse@neodome.net"
Message-ID: <860d319621622f650612d939a890198c@msgid.frell.theremailer.net>
References: <3j5rej5i7cco7frvenbum7g2b06ln49u8q@4ax.com>
Injection-Date: Sat, 21 Sep 2024 03:55:01 +0000 (UTC)
Date: Sat, 21 Sep 2024 05:52:06 +0200
From: letards@sieu.org (letards)
View all headers

In article <3j5rej5i7cco7frvenbum7g2b06ln49u8q@4ax.com>
John Smyth <smythlejon2@hotmail.com> wrote:
>
> On track for what?
> China can build a coal plant in a week and we can't even build a
> charging station.
>
> Buttigieg: Building 8 EV Charging Stations Under $7.5 Billion Investment
> for Them Is �On Track�
>
>
> <https://www.breitbart.com/clips/2024/09/20/buttigieg-building-8-ev-charging-stations-under-7-5-billion-investment-for-them-is-on-track/>
>
> 'On Thursday�s broadcast of CNBC�s �Squawk Box,� Transportation
> Secretary Pete Buttigieg stated that building eight electric vehicle
> charging stations so far under the Inflation Reduction Act�s $7.5
> billion investment in electric vehicle charging stations is �on track.�
> Because most construction will occur in the second half of the decade.

He's a fucking idiot and has no idea what's going on.

Subject: Re: Buttigieg: Building 8 EV Charging Stations Under $7.5 Billion Investment for Them Is 'On Track'
From: Governor Swill
Newsgroups: alt.fan.rush-limbaugh, alt.politics.republicans, talk.politics.guns, comp.os.linux.advocacy, alt.computer.workshop
Organization: Easynews - www.easynews.com
Date: Sat, 21 Sep 2024 05:35 UTC
References: 1 2
Path: eternal-september.org!news.eternal-september.org!feeder3.eternal-september.org!2.eu.feeder.erje.net!feeder.erje.net!feeder2.feed.ams11.usenet.farm!feed.usenet.farm!peer01.ams4!peer.am4.highwinds-media.com!peer01.iad!feed-me.highwinds-media.com!news.highwinds-media.com!fx09.iad.POSTED!not-for-mail
From: governor.swill@gmail.com (Governor Swill)
Newsgroups: alt.fan.rush-limbaugh,alt.politics.republicans,talk.politics.guns,comp.os.linux.advocacy,alt.computer.workshop
Subject: Re: Buttigieg: Building 8 EV Charging Stations Under $7.5 Billion Investment for Them Is 'On Track'
Message-ID: <gnmsejhsp4oksj5qqd40gsdhg4752123pj@4ax.com>
References: <3j5rej5i7cco7frvenbum7g2b06ln49u8q@4ax.com> <860d319621622f650612d939a890198c@msgid.frell.theremailer.net>
X-Newsreader: Forte Agent 3.3/32.846
MIME-Version: 1.0
Content-Type: text/plain; charset=ISO-8859-1
Content-Transfer-Encoding: 8bit
Lines: 35
X-Complaints-To: abuse@easynews.com
Organization: Easynews - www.easynews.com
X-Complaints-Info: Please be sure to forward a copy of ALL headers otherwise we will be unable to process your complaint properly.
Date: Sat, 21 Sep 2024 01:35:33 -0400
X-Received-Bytes: 2465
View all headers

On Sat, 21 Sep 2024 05:52:06 +0200, letards <letards@sieu.org> wrote:

>In article <3j5rej5i7cco7frvenbum7g2b06ln49u8q@4ax.com>
>John Smyth <smythlejon2@hotmail.com> wrote:
>>
>> On track for what?
>> China can build a coal plant in a week and we can't even build a
>> charging station.
>>
>> Buttigieg: Building 8 EV Charging Stations Under $7.5 Billion Investment
>> for Them Is ‘On Track’
>>
>>
>> <https://www.breitbart.com/clips/2024/09/20/buttigieg-building-8-ev-charging-stations-under-7-5-billion-investment-for-them-is-on-track/>
>>
>> 'On Thursday’s broadcast of CNBC’s “Squawk Box,” Transportation
>> Secretary Pete Buttigieg stated that building eight electric vehicle
>> charging stations so far under the Inflation Reduction Act’s $7.5
>> billion investment in electric vehicle charging stations is “on track.”
>> Because most construction will occur in the second half of the decade.
>
>He's a fucking idiot and has no idea what's going on.

Ah ... another troll nym switching so it can continue to show it's ass. plonk

--
Look, I can understand why a lot of people want to block all
of this out of their memories, but we cannot afford to forget
just how terrible Trump’s time at the White House was for this
nation. And we sure as hell can’t afford to put him back there.
So, in no particular order:

03) Gun sales broke records under Trump.
04) Under Trump, America suffered over 1,700 mass shootings.

Subject: Re: Buttigieg: Building 8 EV Charging Stations Under $7.5 Billion Investment for Them Is 'On Track'
From: D. Ray
Newsgroups: alt.fan.rush-limbaugh, alt.politics.republicans, talk.politics.guns, comp.os.linux.advocacy, alt.computer.workshop
Organization: Usenet.Farm
Date: Sun, 22 Sep 2024 17:30 UTC
References: 1
User-Agent: NewsTap/5.5 (iPhone/iPod Touch)
Content-Type: text/plain; charset=UTF-8
Content-Transfer-Encoding: 8bit
Newsgroups: alt.fan.rush-limbaugh,alt.politics.republicans,talk.politics.guns,comp.os.linux.advocacy,alt.computer.workshop
From: d@ray (D. Ray)
References: <3j5rej5i7cco7frvenbum7g2b06ln49u8q@4ax.com>
Date: Sun, 22 Sep 24 17:30:35 UTC
Path: eternal-september.org!news.eternal-september.org!feeder3.eternal-september.org!news.szaf.org!3.eu.feeder.erje.net!feeder.erje.net!npeer.as286.net!npeer-ng0.as286.net!peer01.ams1!peer.ams1.xlned.com!news.xlned.com!peer03.ams4!peer.am4.highwinds-media.com!news.highwinds-media.com!feeder3.usenet.farm!feeder4.usenet.farm!feed.usenet.farm!news.usenet.farm
Cancel-Lock: sha1:O309nFECNS/s0WOhB/SdHgufosY=
Subject: Re: Buttigieg: Building 8 EV Charging Stations Under $7.5 Billion Investment for Them Is 'On Track'
Mime-Version: 1.0
X-Ufhash: NZ4WcP60brEwUegm3AhKJJUpaRk4LF7gS%2FpfHsi6G319gCask0Gm18xf2JkYLmI179aKAuG5E5CdbfIjUeHWMiKLBsuLidzehT7L2pcB%2FNzpQqarJ%2B80HNXn10JfT8fwMeX%2FR8ETKptSv6M0obBJtt4LvHIPtYX8TMNuqWJuLormeURbHsk92zMiBNWaQ%2B3up4HKMWf0bWCs3O7AHjCuUzLlUNZdJqLL930%3D
Message-Id: <EAONDmbLmJwISchgtliADksMTcjdkIPE@news.usenet.farm>
Organization: Usenet.Farm
X-Received-Bytes: 1255
View all headers

John Smyth <smythlejon2@hotmail.com> wrote:
> On track for what?
> China can build a coal plant in a week and we can't even build a
> charging station.

Diversity is our strength. And faggotry.

1

rocksolid light 0.9.8
clearnet tor